Press Photos

Management Board

Wilfried Trepels - Chief Financial Officer (CFO)

Color | 2657 x 1772px | 0.4 MB

monochrome | 2953 x 1969px | 0.5 MB

Steffen Schewerda - Head of Group Operations,
Head of Trailer Systems

Color | 2657 x 1772px | 0.4 MB

monochrome | 2657 x 1772px | 0.4 MB

Jack Gisinger - President SAF-HOLLAND Inc.,
Head of Powered Vehicle Systems

Color | 2657 x 1772px | 0.4 MB

monochrome | 2657 x 1772px | 0.4 MB

Production

CMM measurement of axle beam

2126 x 1417px | 300 dpi | RGB | 0.4 MB

Handling device for loading axle
beams for E-Coating

2126 x 1417px | 300 dpi | RGB | 0.5 MB

Assembly on automated guided vehicles

2126 x 1417px | 300 dpi | RGB | 0.6 MB

Cleaning process during E-Coating

2126 x 1417px | 300 dpi | RGB | 0.6 MB

Manual welding of trailing arm

2126 x 1417px | 300 dpi | RGB | 0.5 MB

Servo-hydraulic road simulator

2126 x 1417px | 300 dpi | RGB | 4.5 MB

Final assembly of the axles on 3 production lines

18 x 11.37cm | 300 dpi | RGB | 1 MB

Confirmation of the add-on parts by means
of a hand-held scanner

18 x 11.75cm | 300 dpi | RGB | 0.7 MB

Assembly on automated guided vehicles

18 x 13cm | 300 dpi | RGB | 1 MB

In process storage before the cathodic dip coating line

18 x 12.45cm | 300 dpi | RGB | 1.2 MB

Simultaneous welding of beams to the axle
body by robot

18 x 12.12cm | 300 dpi | RGB | 1.1 MB

Bolting of the axle nut using a special
automated nut runner

18 x 13.92cm | 300 dpi | RGB | 1 MB

Bolting of the axle nut at the assembly line

18 x 11.64cm | 300 dpi | RGB | 0.6 MB